Lesson 4 - Beyond Budgeting

Contingency Planning

In budgeting planning process, a contingency plan is an anticipation of adverse circumstances, where are considered all possible events so that there can provide a quick response to a crisis.

This process involves the identification of potential incidents, establishing warning signs and problem indicators, and drawing up a response.

It can be in the form of flexible or bracket budget. In both perspectives, the plan must be modified to generate better results when necessary by adjusting to new information and circumstances and allowing resolution of uncertainties.

Flexible Budget

A flexible budget is one variation of a contingency plan which calculates different expenditures levels for variables costs, depending upon changes in actual revenues or other activities measure.

A flexible budget is a useful tool for cost control and as the name suggests is naturally dynamic, far from a static approach. It is more suitable for a set of activities rather than an individual level of activity.

This technique grants a simple development of series of budgets for numerous activity levels. It can be easily prepared by using available widely tools such as Excel spreadsheets.

To establish a flexible budget, the four essential steps are:

1. Estimate the amplitude of expected activity for the period.

2. Analyze cost behavior trends (fixed, variable, or mixed).

3. Separate costs by behavior (variable from fixed).

4. Defining what costs will be impacted at various levels of activity.

Flexible budget allows an automatic adjustment in the budget through changing variable cost totals to the particular level of activity actually accomplished. It is possible because this technique categorizes costs between fixed and variable.

In this way, variances between actual and budgeted costs are adjusted for volume ups and downs, before it computes the differences due to price and quantity component. This approach is useful when volumes vary within a relatively narrow range.

The main use of the flexible budget is to accurately measure performance by comparing actual costs for a given output with the forecasted costs for the same level of outputs. It is especially indicated for marketing budgets as well as for manufacturing cost budgets.

The flexible budget considers the uncertainties inherent in the process, three types of forecasts could be developed: one optimistic, one balanced, in-between, and a pessimistic or extremely conservative.

Bracket Budget

In a straightforward explanation, Bracket Budget is one type of contingency plan where it estimates costs at a higher and lower level than the costs basis, and sales are predicted for both levels. The objective of this method consists of adjusting the differences between the actual and forecasted sales based on the calculated costs levels. It also provides a possibility to manage the impact on earnings and expenses.

This approach could be opportune for situations where the organization is facing potential downside risks.

Are you enjoying the subject? If you like the topic and want to have some more, you can find below our references. There are entire chapters regarding it.

Source:

Bragg, S. M. (2013). Budgeting: The Comprehensive Guide. Accounting Tools. Chapter 16.

Lalli, W. R. (Ed.). (2011). Handbook of budgeting (Vol. 562). John Wiley & Sons. Chapter 31.

Shim, J. K., Siegel, J. G. (2005). Budgeting basics and beyond (2nd Ed.). John Wiley & Sons. Chapter 1 and 7.